Title |
Vestar VAW24F12FT 2 Ton 1 Star Window AC
|
---|---|
Brand |
Vestar
|
Model No |
VAW24F12FT
|
Capacity in tons |
2 Ton
|
Star Rating |
1
|
Inverter Technology |
No
|
Indoor Noise Level |
High: 53 dB
|
---|
Operating Current |
10.7 Ampere
|
---|---|
Cooling Capacity |
6257 Watts
|
Power Input |
2431 Watt
|
EER |
2.57 W/W
|
Power Requirements |
AC 220 - 240 V, 50 Hz,Single
|
Moisture Removal |
2.2 Litres/Hr
|
Cool Mode |
|
---|---|
Dehumidification |
No
|
Dry Mode |
|
Sleep Mode |
|
Turbo Mode |
|
Remote |
|
---|---|
Night Glow Functions On Remote Buttons |
No
|
Active Carbon Filter |
No
|
---|---|
Anti Bacteria Filter |
No
|
Catechin |
No
|
Dual Protection Filter |
No
|
Triple Filter |
No
|
Virus and Allergy Safe Filter |
No
|
Auto Restart |
|
---|---|
Auto Clean |
|
Front Panel Display |
|
Fuzzy Logic |
No
|
Hot & Cold |
No
|
Jet Cool |
No
|
Self Diagnosis |
No
|
Timer |
On-Timer: Off-Timer:
|
Other Convenience Features |
Quiet Operation
|
Color |
White
|
---|---|
Compressor |
Rotary
|
Air Flow Direction |
2 Way Direction
|
---|---|
Auto Air Swing |
Present
|
Speed Setting |
|
Installation Details |
Installation of Air-conditioner is charged extra to customer at the time of installation and needs to be paid directly to the service engineer. Standard Installation of Window AC Covers only 1.Installing the Housing 2.Inserting the unit 3.Sealing the gaps with Heat insulating material 4.Connection to Stabilizer or Power point in the range of Power Cord Provided by Manufacturer. 5.Temperature/Performance Check & Demo and Maintenance tips. 6.Supporting customer in Masonry, Fabrication, and Electrical work. Not covered under standard Installation of AC- 1.Plumbing and Masonry Work if any. 2.Wiring extension from Meter to site, Power point/MCB fitting and any other Electrical work 3.Concealed piping /electrical wiring inside the wall 4.Grill/Glass Cutting and Welding work 5.Dismantling/Shifting of Old AC`s
Read More
|
---|---|
Services Included In Basic Installation |
Standard Installation of Window AC Covers only 1.Installing the Housing 2.Inserting the unit 3.Sealing the gaps with Heat insulating material 4.Connection to Stabilizer or Power point in the range of Power Cord Provided by Manufacturer. 5.Temperature/Performance Check & Demo and Maintenance tips. 6.Supporting customer in Masonry, Fabrication, and Electrical work. Not covered under standard Installation of AC- 1.Plumbing and Masonry Work if any. 2.Wiring extension from Meter to site, Power point/MCB fitting and any other Electrical work 3.Concealed piping /electrical wiring inside the wall 4.Grill/Glass Cutting and Welding work 5.Dismantling/Shifting of Old AC`s
Read More
|
Installation Warranty |
1 Year Comprehensive, 5 Years Compressor
|